Progress update:
My cars in with welders fixing rust issues. Will update with pictures as the work progresses. In the meantime ive been busy doing what i can with the parts that are off. Heres some pictures of what ive been doing
I then took my trailing arms, bolts and suspension springs off and sent to powdercoaters and plater
Progress update:
My cars come out of welders. I was unfortunate to have rust issues on my ek9.
The main affected areas was the driver and passenger floorpan. The rest including arches were fine. Here are some pics of the work done
After the welding got done i then had the full underneathred oxide primer and white stonechip then a coat of paint over.
I had the rear brake lines renewed as the existing were corroded
Progress update
Eg subframe now fitted to car with all new hardrace arms and new upgraded anti roll bar. Traction bar fitted. saxo powersteering pump fitted and honed brake booster delete. Also fitted new wilwood midilite 4 pots
Small update
Had a big order from the states. Fitted a new digidizzy as i was having issues with my oem dizzy. Digidizzy fixed all my issues i had works a dream.
Got an order from real st for new ferrea valve train. Planning s head rebuild changing everything. Valves springs locks steel retainers spring seats and seals. Also ordered 625 head studs from 4piston. And a new throttle body due to having issues with tegiwa one.